Modular laboratory Bolle

Modular laboratory Bolle
Bolle

for Price / Quote
for Documentation
for Questions

This multi-level construction project required a combination of various designs in order to utilise the advantages of each individual style. The basement of the laboratory building was installed on site with precast concrete components while the modules were being prefabricated. Simultaneous to the final module completion stage, the measuring vehicle hall could be constructed in a steel system design.